hydraulic concrete breaking manhours per cubic yard

  • Home
  • hydraulic concrete breaking manhours per cubic yard
City of Tempe EXHIBIT A

Lean Concrete Fill; 1-Sack CLSM Cubic Yard 104 $65.00 $6,760.00 $6,760.00 Class 'A' Concrete, 4000psi Cubic Yard 16 $78.00 $1,248.00 $1,248.00 Hydrophelic Waterstop Material, Roll LF 170 $4.50, $765.00 $765.00 Equipment Signage and Tags Lump Sum 1 $500.00 $500.00 $500.00,

Cement & Concrete Basics FAQs

Concrete is a mixture of aggregates and paste. The aggregates are sand and gravel or crushed stone; the paste is water and portland cement. Cement comprises from 10 to 15 percent of the concrete mix, by volume. Through a process called hydration, the cement and water harden and bind the aggregates into a rocklike mass.

How many excavators would be needed to excavate a 100,000 ...

That's 44,000 cubic yards in 10 days or 4,400 cy per day. You could do that pretty easily with two large (100,000 lb class) excavators top-loading off-road trucks with 4 yard buckets. Your limiter is the truck cycle not the excavators.

Estimating Excavation Revised

cubic yards moved. That's now the accepted procedure for most projects, from single-family homes to roads and commercial jobs. Some projects are still bid lump sum, but those are the exceptions. It's common for the actual amount of dirt moved to be more or less than expected, so the best way to protect your business is to bid by the cubic yard.

AGENCY OF TRANSPORTATION MATERIALS DIVISION CLASS …

a standard cure until removal for capping and breaking at 7, 14 and 28 days. Three cement contents were used in our mix designs 610, 634 and 660 pounds per cubic yard. For each cement content three different blends of 1-1/2 and 3/4 inch coarse aggregate were …

Scenario Worksheet - USDA

5lbs per acre added to mix as dormant planting (option) Materials 85 Fescue, Creeping Red (Festuca rubra) Introduced Perennial Grasses and shipping. Pound $1.99 10 $19.90 veg component 20 lbs per acre Materials 84 Wild Rye, ia (Elymus icus) Native Grasses and shipping. Pound $9.81 8 $78.48 veg component 15 lbs per acre

Remote Control Concrete Demolition System

pounds and has variable outputs of 1000 to 1500 beats per minute. The bucket has a capacity of 1/4 cubic yard and has a smooth cutting edge. Other attachments available include a concrete crusher, a La Bounty shear, and a 1/4-yard clamshell bucket. Smaller and larger sizes of the Brokk are available from Duane Equipment Corporation. The Brokk BM150

how many yards per hour can a crusher crush

Processes up to 2,400 lbs. per hour of unflattened cans or up to 3,600 lbs. per hour of ... 25 HP; 460 volt 3 phase wiring; 1 cubic yard hopper ... The GC100 Glass Crusher from CP Manufacturing crushes up to 7,000 lbs. of glass per hour.

Construction - ScienceDirect

Jan 01, 2005· Calculate the quantities of cement, sand, and gravel required for 1 cubic yard of 1" 2" 4 concrete. 44 C- 1+2+4 = 6.28 bags of cement S -6.28 x 2 • 0.035 = 0.44 cubic yard of sand G -6.28 x 4 x 0.035 = 0.88 cubic yard of gravel To increase or decrease slump of concrete, add or subtract 1 gallon of water per cubic yard of mix and subtract or ...

Hydraulic Breaker Owner s Manual - Rock Breakers Inc.

application. It is not the energy per blow, but the fast blow rate that destroys the concrete's structural integrity. On concrete walls, footings and floors use a 750-1,500 ft·lb breaker. With larger projects consisting of large footings greater than 4 cubic yards, use a 2,000-5,000 ft·lb breaker.

3. CALCULATION OF MACHINE RATES

3.1 Introduction. The unit cost of logging or road construction is essentially derived by dividing cost by production. In its simplest case, if you rented a tractor with operator for $60 per hour - including all fuel and other costs - and you excavated 100 cubic meters per hour, your unit cost for excavation would be $0.60 per cubic meter.

Breaking up is hard to do - Concrete Construction

rates of more than 1,100 cubic y a r ds of unre i n f o r ced concrete per d a y, with 50 to 250 cubic yards per day being typical for mid-s i z e d Whether mounted on a backhoe-loader or an excavator, hydraulic hammers combine mobility and impact power to demolish concrete quickly and efficiently. Breaking up is hard to do By John A. Koski

Concrete Calculator - Ultimate Concrete Estimation Tool ...

Convert dimensions to feet if they aren't already. Conversion calculators make it easy to convert inches, yards, or meters to feet.; Multiply the width times the length times the height (W × L × H), or use our volume calculator to find the cubic feet.; Convert the volume to cubic yards from cubic feet. To do so, divide the cubic footage by 27 to get the yards of concrete needed.

SECTION 600 MISCELLANEOUS CONSTRUCTION SECTION 601 ...

per cubic yard flyash and 20 to 30 pounds per cubic yard silica fume. The total content of Type II portland cement, flyash and silica fume shall be 580 to 640 pounds per cubic yard. Laboratory trial mix for Class H concrete must not exceed permeability of 2000 coulombs at 56 days (ASTM C 1202). Laboratory trial mix for

2021 Cost of Concrete Removal | Price of Concrete ...

The cost to remove concrete typically costs $1,037 or between $536 and $1,553, at a rate of $2 to $6 per square foot. What you'll pay depends on a variety of factors, including the type and amount you need taken out, as well as the complexity of your project. Local labor and material costs, as well as disposal, also impact the final price.

SAM.gov

Aug 25, 2020· GROUP 3 - Welding machine, well points, compressors, pump heaters, farm tractors, form line graders, ditch witch type trencher, road finishing machines, concrete breaking machines, rollers, miscellaneous equipment operator, seaman pulverizing mixer, power broom, seeding spreader, tireman - (for power equipment ) conveyors, loaders other than ...

Concrete Calculator

Choose Round Column (or Round Slab) on the calculator. Enter Height 4 ft (or 48 in) Enter Diameter 10 in. Calculate and the answer is 0.08 cubic yards for one concrete tube. Multiply 0.08 x 50 = 4 total cubic yards of concrete for 50 tubes. Note that this calculation is the volume of your tubes only and does not account for any overflow or loss ...

TECHNICAL CALCULATION AND ESTIMATOR'S MAN-HOUR …

The most complex work in developing these man hours was the work on the man hours f or piping abov e ground. A basis I used was a system for estimating the value of erection works of a German Company LINDE, which I completed and modified. Gener ally, for elabor ation of the man hours f or er ection/installation of process equipment,

American Concrete Institute

Mix Design for 1 Cubic Meter Mix Design for 1 Cubic Yard* 1 kg = lbs Volume (m3) SSD Weight (kg) Measured Batch Weight (kg) 1 m3 = cf cy 1 cy = m3 1 ml = oz 1 mm in 1 MPa psi 1 kg/m3 pcf ml/ 100 kg oz/cwt 1 oz/cwt = cement *adjusted by 0.7645 cubic yards per m3 Measured Batch Weight is the weights of all materials used to mix your concrete ...

Rate Analysis of Excavation in Earthwork -Calculate ...

That means, a hydraulic excavator can excavate 242.4242 m 3 of soil in one day. Its cost per day including driver and fuel is Rs. 5000. Its cost per day including driver and fuel is Rs. 5000. Then the cost of 10m 3 of excavation can be calculated as: No. of days required for …

Chapter 4: Construction Details, Section 90: Concrete ...

ASTM C143, "Standard Test Method for Slump of Hydraulic-Cement Concrete," if specified in the applicable concrete application. ... Note that if liquid admixtures are used in a cumulative amount of more than 1/2 gallon per cubic yard, the amount of liquid admixture is to be considered free water.

Schedule of Equipment Rates | FEMA.gov

Aug 07, 2020· The rates on this Schedule of Equipment Rates are for applicant-owned equipment in good mechanical condition, complete with all required attachments. Each rate covers all costs eligible under the Robert T. Stafford Disaster Relief and Emergency Assistance Act, 42 U.S.C. § 5121, et seq., for ownership and operation of equipment, including depreciation, overhead, all maintenance, field …

Hydraulic Rock Splitters - Accurately break up rock and ...

Groundwork's Hydraulic Rock Splitters allow you to accurately break up rock and concrete quickly, safely and quietly - making them ideal for city demolition work. Our easy to operate splitters are used in quarrying, tunneling, demolition, civil construction and large-scale excavations in solid rock.

U-RENT-IT-REDI-MIX-CONCRETE-RENTAL

For a rough estimate of concrete needed for a given job at 4 inches thick, calculate the square footage - length x width in feet - and divide the result by 81 to get the amount in cubic yards. For example: slab 15' by 20' = 300 sq. ft. Divide by 81 = 3.71 yards.

Concrete Costs & Prices - ProMatcher Cost Report

Concrete Delivery $103.00 to $105.00 per cubic yard (3,000 psi 3/4" crushed stone) $113.00 to $116.00 per cubic yard (5,000 psi 3/4" crushed stone) $107.00 to $110.00 per cubic yard (4,000 psi 3/4" crushed stone) Cash or check Reported by: David Downey, Downey Redi Mix See the Sugar Land Concrete Cost Report

2021 Cost to Demolish Concrete | Concrete Demo Prices ...

Aug 03, 2021· The national average for concrete demolition and removal is $1,038, or between $2 and $6 per square foot. The amount you pay depends largely on thickness, size, and if the old concrete being demolished was reinforced with wire mesh or steel bars. The range you should expect to pay for removal and demolition is between $250 and $3,200 on average ...

Concrete Pricing Guide: All the Facts and Figures

Even though concrete is a typical material to use, it can vary in cost ranging from cheap to expensive. Concrete costs $2.83- $3.57 per square foot and with labor included it is between $4-8 per square foot. The price of concrete is dependent upon the desired thickness and type of concrete needed for a …

Rate Analysis of Excavation in Earthwork

•Rate analysis of excavation in earthwork use of IS Code 1200 part 1, Part 27, IS 4988, IS 12138 (Part IV) and CPWD for calculation is this measurement of the quantity of excavation to be carried out, the cost of labour, machinery, and other equipment like hard soil for breaker, etc.